Me postulé en línea. El proceso tomó 4 semanas. Acudí a una entrevista en WSP en mar 2022
Entrevista
Professional managers made the interview really smooth, answered questions openly, open discussions from both sides involving details if the role, company culture and values, most important projects in the portfolio, etc.
Preguntas de entrevista [1]
Pregunta 1
Experience details
Most important projects managed
Project Management aspects
Business development aspects
Continuous development training
Friendly back and forth including questions of past achievements and engineering process with the hiring manager and a junior staff member over an online video call lasting about 60 mins.
The 1.5‑hour interview was fully technical, evaluating advanced structural engineering expertise, code interpretation, design calculations, load analysis, detailing, and problem‑solving. It emphasized practical application of standards, leadership in complex projects, and ability to deliver safe, efficient, and innovative structural solutions at a senior level.
Preguntas de entrevista [1]
Pregunta 1
How do you check drift limits for a 10‑story RC frame building under wind loads per ASCE 7‑16?
Me postulé en línea. El proceso tomó 3 meses. Acudí a una entrevista en WSP (Bengaluru) en feb 2025
Entrevista
took interview and no response just a time waste, Management is not responding to any calls or mails. Even after shortlisted and interview done its been 3 months no response at all.