Me postulé a través de un reclutador. El proceso tomó 4 semanas. Acudí a una entrevista en United Technologies (Hyderabad) en sep 2014
Entrevista
I went for interview through one of the consultancy in hyderabad for WPF requirement. For the first round i did answered almost all the questions as those are basic. Net questions. I asked panel for WPF requirement. She said she will redirect to WPF team in sometime. I have waited for 15min outside one person came and told me there is no availability of WPF team and interview will be scheduled again. I left from there and did not get call for WPF. I have been asking consultancy and HR of UTC. They are just saying it has been on hold. I want to hear whether it is a positive or negative and i didnt like to put it on hold.
Preguntas de entrevista [1]
Pregunta 1
All.are basic. Net questions. Nothing as difficult