Me postulé en línea. El proceso tomó 2 semanas. Acudí a una entrevista en TE Connectivity (Hemet, CA) en sep 2013
Entrevista
Maintenance Department Supervisor did one interview, then a second interview with department supervisor and production second shift supervisor. Both interviews took approximately a hour each which includes a plant walk around with observation questions asked.
Preguntas de entrevista [1]
Pregunta 1
How many years experience did I have with injection molding equipment? Was I familiar with material dyers and conveying systems.