Me postulé a través de otra fuente. El proceso tomó 2 semanas. Acudí a una entrevista en Stant Manufacturing (Seúl)
Entrevista
The first interview was with HR by phone. The second interview was with the Engineering Manager, who review your technical knowledge and experience. The final interview was onsite at the manufacturing plant.
Preguntas de entrevista [1]
Pregunta 1
What are the 5 stages of product development process?