Me postulé en línea. El proceso tomó 2 semanas. Acudí a una entrevista en Reading Borough Council (Reading, Inglaterra) en sep 2022
Entrevista
2-hours in total. 1 hour to prepare a presentation about how I would tackle an 18-month waterfall project The project schedule chart was printed in 4-point text and I asked for a larger copy which was provided within the hour of preparation. After the process, I received an email offering feedback. I accept this but no feedback was received.
Preguntas de entrevista [1]
Pregunta 1
I was asked: if the council had chosen a product that required rigid adherence to a waterfall PM approach, how would that impact my suggestion of staging roll-outs over 18 months?