Me postulé a través de otra fuente. El proceso tomó 4 semanas. Acudí a una entrevista en Pall (Dubai) en jun 2011
Entrevista
I was recommended to this company by someone. The HR admin called me that I have an interview with the director of operations since I am applying to an Engineering position. The interview lasted for 30 minutes asking about details of the courses projects that I did.
Preguntas de entrevista [1]
Pregunta 1
What did you do in this project (Quality control)??? what was your direction to solve the problems faced you to complete this project?