Ir al contenidoIr al pie de página
  • Empleos
  • Empresas
  • Sueldos
  • Para empleadores

      Impulsa tu carrera profesional

      Averigua cuánto podrías ganar, encuentra el empleo perfecto y comparte información sobre tu vida laboral y personal de forma anónima.

      employer cover photo

      Ocean Builders

      ¿Esta es tu empresa?

      Información
      Evaluaciones
      Pago y prestaciones
      Empleos
      Entrevistas
      Entrevistas
      Búsquedas relacionadas: Evaluaciones de Ocean Builders | Empleos en Ocean Builders | Sueldos en Ocean Builders | Prestaciones en Ocean Builders
      Entrevistas en Ocean BuildersEntrevistas para el cargo de Marine Engineer en Ocean BuildersEntrevista en Ocean Builders


      Glassdoor

      • Acerca de
      • Premios
      • Blog
      • Contacto

      Empleadores

      • Cuenta de empleador gratuita
      • Centro de empleador

      Información

      • Ayuda
      • Pautas
      • Condiciones de uso
      • Privacidad y opciones de anuncios
      • No vender ni compartir mi información
      • Herramienta de autorización de cookies

      Trabaja con nosotros

      • Anunciantes
      • Oportunidades laborales
      Descargar aplicación

      • Buscar por:
      • Empresas
      • Empleos
      • Ubicaciones

      Copyright © 2008-2026. Glassdoor LLC. "Glassdoor", "Worklife Pro", "Bowls" y sus logotipos son marcas comerciales registradas de Glassdoor LLC.

      Empresas seguidas

      Sigue a tus empresas favoritas para estar al tanto de las últimas oportunidades y disponer de información desde adentro.

      Búsquedas de empleo

      Recibe recomendaciones y actualizaciones personalizadas al iniciar tu búsqueda.

      Las mejores empresas en cuanto a "Remuneración y prestaciones" cerca de ti

      avatar
      Amazon
      3.7★Remuneración y prestaciones
      avatar
      KPMG
      3.6★Remuneración y prestaciones
      avatar
      Telefónica
      3.8★Remuneración y prestaciones
      avatar
      Toyota Motor Corporation
      3.9★Remuneración y prestaciones

      Entrevista para Marine Engineer

      30 may 2025
      Candidato de entrevista anónimo
      Malé
      Sin ofertas
      Experiencia negativa
      Entrevista promedio

      Solicitud

      Me postulé en línea. El proceso tomó 8 semanas. Acudí a una entrevista en Ocean Builders (Malé) en mar 2025

      Entrevista

      Contacted thru linkedin quick apply. They sent me an engineering questonaire. It took me about 1.5 hours to complete. They asked me to do a design challenge with CAD about an underwater data center i spent about 6 hours creadting the 3D model and docuemntation. They proceeded with another online psicometric test which took about 30minutes. At this point I had nos psoken to anyone and their emails where super brief. FInally they respond with emails saying somone will get back to me shortly but have essentilally ghosted me.

      Preguntas de entrevista [1]

      Pregunta 1

      Section 1: Knowledge Check 1. Stability Book: a. What is the purpose of a stability book on a vessel, and what key information does it include? A stability book includes the vessel's hydrostatic parameters and righting moments relative to the 6 degrees of freedom of a floating structure. Most importantly in my opinion the righting moment relative to the heel angle across the longitudinal span of the structure (GZ curve, where capzinging is likely to occur). All data in the book should be included in all load conditions (Lightship to fully loaded and with extreme configurations relative to tankage and cargo all situations should be verified). Furthermore, particular parameters such as metacentric height at varying loads is given which is useful to determine the natural rolling period of the structure to avoid unstable behavior. b. How would you verify that a vessel remains compliant under varying load conditions? I would personally use commercially available hydrostatic software such as Maxsurf or RhinoHyd in addition to a panel method solver (only valid for small velocity motions ie Froude number less than 0.3 which is no problem for these offshore structures) and wave interaction such as Ansys Aqwa or OrcaFlex (no personal experience in OrcaFlex). Most importantly I would keep an updated weights book in the as built condition during outfit to ensure that all weights in the vessel match. The weightbook would interpolate between hydrostatic data at different load lines to simplify engineering. 2. Class vs Flag State: a. Differentiate between the responsibilities of the classification society and the flag state. Classes such as DNV, Llodyds, BV are responsible for ensuring that technical characteristics are met, with the structure, stability, machinery, safety (fire fighting, lifesaving etc..). Class societies also protect the environment and stipulate technological requirements for craft. There are various subsections one can select to be classified by for instance Battery Power or Ice class. Usually classification societies use the symbol ✠ (Maltese cross) to denote approval. b. Explain a scenario where both must be involved during a marine incident. In the hypothetical scenario similar to the MS Estonia ferry incident where the bow loading door failed due to technical requirements and created slush onboard capsizing the ship and creating multiple casualties. I assume the ships class society was investigated fro the approval of the loading doors design and damage stability in the flooded deck. Furthermore SOLAS had adopted new regulations after the incident with the requirement of ships to carry EPIRB (Emergency personnel indicating radio beacons). 3. SOLAS Compliance: a. What are the most critical SOLAS chapters relevant to the design of an underwater structure? I opened the 2024 consolidated edition of solas and could not find regulation that applies exclusively to underwater structures, hence I would assume that Escape routes as it is particularly challenging underwater. 1 b. How would SOLAS affect the crewed or uncrewed nature of your system? Since solas stands for the UN ́s safety of life at seam uncrewed structures do not require compliance nonetheless when deployment is in effect (towing lifting, anchoring etc..) the support vessel must meet criteria to ensure the safety of the installation crew. 4. VHF & AIS: a. Explain the use and range of VHF and how it complements AIS. VHF or very high frequency radio is the most widely used marine radio frequency (ship to ship communications etc..), AIS uses the same frequency and antennas (Class B at least Class A is via satelite) to transmit vessel details (Vessel name, Speed, Course over ground, and GPS coordinates lat lon, most importantly however it can even transmit the ships, current draft, flag state, MMSI number last port of call and next port of call). AIS buoys can serve as aids to navigation notifying mariners of potential hazards (like an underwater obstruction) ro even fisherman for their position of their nets. I am a certified Short Range radio operator and have International Operator of pleasure craft (ICC), both issued by the UK ́s RYA, I have over 7000 nm of offshore navigation experience and more than 100 sea days. where I have had extensive use of radio AIS and radar equipment for communication between both pleasure and commercial craft furthermore I have complete the installation on NMEA 2000 networks on sailboats myself and I am a huge proponent of it as AIS is more precise than radar in providing CPA and TCPA (Closet point of approach and time to it). However, AIS is not a substitute to radar particularly in areas of the world where the technology is not yet used; radar must be used as a primary means of collision avoidance. b. How would you integrate AIS into an autonomous structure like an underwater data pod? GPS, or VHF waves travel underwater, hence GPS, and VHF antennas with a wired connection would have to be placed on the surface with a buoy for instance to transmit the position of the data pod accurately. An alternate solution could be to program a known position with a nearby existing antenna but this would require falsifying the GPS input of the AIS transponder and it would only have the range of the nearby antenna and it would not reflect unexpected movements of the pod. 5. Radar Systems: a. Compare the performance of X-band and S-band radar in different weather and sea conditions. X-Band radar will detect nearby objects with high precision whereas S-bands longer range but lower precision might be useful for detecting incoming weather systems or birds (In the case of fishing boats). One of the downsides of X/band is that it can get lots of noise from significant wave peaks in bad weather. b. Which would you recommend for monitoring marine trac near your system, and why? X-band because it is more precise at detecting objects once they are in proximity. Additionally, S-band radars require a lot more power, sometimes greater than 30kW and have huge spans of more than 3m, usually the emitter beam is not covered by a dome and are heavy which complicates installation and maintenance. 2 6. Corrosion / Osmosis / Fouling: a. Describe the main differences among corrosion, osmosis, and fouling. b. What design strategies or materials ● Corrosion has to do with the oxidation to metals. There are various types of corrosion mainly due to exposure to the environment, contact with dissimilar metals (electron traveling between them), or crevice corrosion which occurs with trapped moisture in a metal part. ○ To prevent and control you can use alternatives materials like aluminium, composites or plastics, use protective marine coatings and frequently repaint, use stainless steel when strength is required. When using fasteners it is important to isolate two metals with grease or sikaflex. Sacrificial anodes zincs have to be placed to make sure that components are not eaten. ● Osmosis is a phenomenon that attacks fibreglass structures in moist or underwater environments with water soluble compounds causing blisters, delamination and structural failure. ○ It can be avoided by using high quality resins like epoxy with thick barrier coats, gelcoats or avoiding prolonged exposure. Frequent checks when the vessel is on a dry dock. ● Fouling is an organic growth of marine life on underwater surfaces, barnacles, algae etc.. ○ Avoided by using anti-fouling bottom paint either very slippery to prevent grip from organic compounds or with toxic compounds that kill them (or both). There are also new coatings like Finsulate that mimics seal fur (but requires vessel motion). My favourite one is Intersleek (Not toxic silicon based so it is very soft and fragile but effective). And I would be keen to try Clean Ocean Coatings very hard and excellent when paired to an underwater robot toing preventive fouling maintenance. Last but not least, ultrasonic vibration transmitters fixed to a metal hull (Has to be metal cannot use a soft antifouling) 3 Section 2: Design Challenge Design a sealed underwater data module (like Microsoft’s Natick) deployed on the coast at: ● Depth: 30 meters ● External Temp Range: 4°C–18°C ● Salinity: 35 PSU (open ocean) ● Dimensions Limit: Max 3m (diameter) x 10m (length) ● Deployment Duration: 3 years without retrieval ● Power: Subsea cable (5 kW max) ● Data: Fiber optic uplink ● Location Traffic: Moderate shipping activity nearby ● Marine Growth: Moderate biofouling region 1. Design Overview (max 500 words) ○ Shape, structure, and materials I have opted for a tubular structure using NPS 16 with schedule 10 wall thickness standard in the offshore industry with a 406.4mm OD and 6.35mm a back of the napkin calculation yields a safety factor of 2x to withstand the pressure at 30. The tubes are held together with 12mm steel plates with slots to fit into every tube. In each end and at the centerline with 6 plates total. The legs which also fit into a 40ft container have to be installed when the crane is in use. (The system has not been designed). ○ Internal systems: power, cooling, redundancy, access The interior of the 21 tubes provide 23m3 of internal volume. I am hoping that passive cooling will be sufficient with the tubular structure. Having so much exposed surface area near the electronics nonetheless a glycol water mixture and fans running through a heat exchanger could be advantageous. There are 21 tubes hence there is redundancy rather than just one. The tubes are interconnected to allow for cable trays to travel. Power comes from two cables and data from another two uplinks. Thru hull cable inlets are fitted with a cofferdam to ensure watertightness of the structure. Electronic equipment is placed in trays that slide in and out of the compartment and the end of each tube is sealed with a flat plate 20mm thick (Since the opening area is so small no need to create a domed structure or bulkheads inside the pipes). Overall the design focuses on logistical ease fitting into a container. Manufacturability using standard pipes available off the shelf and no large custom parts needed. Lastly, the multiple tube arrangement makes it excellent for heat transfer. 4 2. Stability & Deployment Strategy ○ How will you maintain stable positioning under varying currents? This is the major downside to my design I should have opted for a 3 legged version one anchored and two with yaw free rotation around a single anchor point, nonetheless I picked 4 hence ○ How is the unit ballasted or tethered? All legs are ballasted with sand (cost effective and widely available). Enough sand would be calculated to keep the system in place by its own weight nonetheless a 3 sets of redundant SHHP (super high holding power) anchors within a delta type anchor could be deployed from the surface ship to avoid divers. ○ Deployment: The structure is designed to fit in a 40ft container with the legs folded hence shipping worldwide is easy. It can be loaded onto the deck of a ship with at least 12m*12m open space and deployed from a ship crane. 3. Risk Analysis Table ○ Corrosion, pressure fatigue, marine life interference, etc. ○ Mitigation techniques Risk Description Risk Factor Mitigation techniques Corrosion Steel degradation due to saltwater exposure 8 Use sacrificial anodes, and inspect with ROV 2 periodically. Deployment Challenges or failures during installation (e.g., sinking, anchoring issues). 7 Conduct seabed tests and simulations prior to physical launch. Practice leg unfolding on land prior to real on-ship scenario. Implosion Collapse of the structure due to external water pressure exceeding design limits. 6 Conduct FEA analysis of detailed parts. Use approved materials. Fouling Marine growth (barnacles, algae) on the structure, increasing drag and corrosion risk. 5 Apply anti fouling ruth potential cleaning by ROV. (3 years should not be a problem for intersleek even static vessels) Power Failure Loss of power disrupting data center operations (e.g., cable failure, equipment malfunction). 9 2x power and data cables, Lithium battery bank with 60kWhrs to supply power for at least 12 hrs. Collision Structural failure of vessel or failure due to contact with traffic of marine life 7 AIS Buoy and radar reflector, notification to local authorities to avoid surface fishing. Use class approved reinforced cable to avoid 5 4. Comms & Navigation Safety ○ Use of AIS, radar reflectors, lights, or other safety signals As previously mentioned in the AIS question of section 1. a buoy floating over head with VHF and GPS antennas or a ground based transponder with a hard coded GPS coordinates. ○ Maintenance of compliance with maritime safety regulations Regular surveys by class societies and use of approved materials and components, crew for installation and removal with appropriate training such as STCW-95.
      Responder pregunta