Me postulé en línea. El proceso tomó 4 semanas. Acudí a una entrevista en Novare Group (Tampa, FL) en mar 2009
Entrevista
met with director of engineering had a good interview with him seemed positive about my qualifications,seemed interested in hiring me,said he would be in contact with me.
Preguntas de entrevista [1]
Pregunta 1
how long have you been in the facilities maintenance field.