Me postulé a través de una facultad o universidad. El proceso tomó 1 día. Acudí a una entrevista en Micron Technology (Boise, ID) en nov 2010
Entrevista
I had an interview the day after a career fair at my university. I was invited for an on-site interview a month later in Boise, ID. Micron paid for the trip for my wife and myself for three days which was really impressive. The interview lasted ~ 5hrs and consisted of 7 - 1:1 interviews with HR and multiple employees in different departments. They all seemed to enjoy their job and Micron. Most of the engineers that I interviewed with had been with Micron for 10+ years.
Preguntas de entrevista [2]
Pregunta 1
Most of the question were MOSFET or semiconductor related.
-Sketch and explain an N-channel MOSFET
-Signal delay through a gate
-Behavioral related questions
Micro/Nano fabrication processes
- what is the limit in optical lithography
- how can you change the (Vt) in a MOSFET
- what are the effects of "hot carriers" is a MOSFET
Acudí a una entrevista en Micron Technology (Singapur)
Entrevista
I was given by a pair of friendly interviewers. They let me finish the technical test and then take the test to meet the interviewers. Interviewers are professional engineers in their own role and they even shared more details about the job they are hiring.
Face to face at site, standard interview process.
First round had one interviewer, just an overall culture fit check to see if you are capable of understanding the needs of the team.