HR first
Excel Test (Just pivot tables, and simple data manipulations)
Non-technical interview
Generic questions
Outcome isn't confirmed until contract is signed and there's alot of delays.
Overall, it's simple.
It takes a while to get to the building site from the station.
Preguntas de entrevista [1]
Pregunta 1
Will be provided with a excel data set.
-Watch a video on how to make a pivot table and pivot chart.
Me postulé en línea. El proceso tomó 3 semanas. Acudí a una entrevista en LG Electronics (Weybridge, England) en oct 2023
Entrevista
First round was virtual call, second and third were on the same day in person. One being an excel test, demo through a shared screen. Third was with the director, manager, and hr
Me postulé en línea. El proceso tomó 2 días. Acudí a una entrevista en LG Electronics (Auckland, ) en sep 2019
Entrevista
Through a consultant we had a meeting set using email went to the NZ office and did interviews with 3 korean people 1 white lady. Lol i was told that i will do interview with only one guy