Me postulé a través de una recomendación de un empleado. Acudí a una entrevista en First Solar (Bridgewater, NJ) en may 2015
Entrevista
The way to get an internship is usually being recommended by someone. The interview is not really a interview, they presented the company and the people in charge of the different areas. People are very smart and nice. Great Atmosphere
Otras evaluaciones sobre las entrevistas para el cargo de Project Development Engineer en First Solar
Me postulé en línea. El proceso tomó 3 meses. Acudí a una entrevista en First Solar (San Francisco, CA) en may 2018
Entrevista
First phone call was with recruiter/HR for screening interview.
Second interview was an on-site interview from 8 am to 12pm. 30 minutes per interviewer/panel.
Never heard back after the on-site interview despite follow-up emails sent. Considering this opportunity closed.
For future interviewees I would suggest asking for a phone interview with the hiring manager prior to the onsite interview. The job description was not clear that the role was not a design role and was in fact a front-end site identification/evaluation role, which I honestly preferred but it was probably clear to the hiring manager that I didn't realize that prior to going in.
Preguntas de entrevista [1]
Pregunta 1
What risks would you look for when evaluating a site for a solar panel installation?