Me postulé en línea. El proceso tomó más de 1 semana. Acudí a una entrevista en FXI (Fort Wayne, IN) en mar 2016
Entrevista
Initial phone interview with HR. I was then brought in for an on-site interview with pour line manager and chemical engineer already on staff. Given a tour of the plant, to watch pour line in action.
Preguntas de entrevista [1]
Pregunta 1
Basic questions, very easy-going and relaxed. Pretty sure I didn't get job because of salary requirements.