Me postulé a través de otra fuente. El proceso tomó 3 meses. Acudí a una entrevista en Advanced Structural Alloys (Oxnard, CA) en dic 2013
Entrevista
I had 4+ interviews with this joke of a company. It took over three weeks to set up an interview with them. Walking through the plant had a lot of OSHA issues and the place was filthy. They finally passed on me for no particular reason.
Preguntas de entrevista [1]
Pregunta 1
They kept on changing the criteria of the position and what my job duties would be.