Me postulé en línea. El proceso tomó 1 semana. Acudí a una entrevista en ABB (Bengaluru) en oct 2023
Entrevista
I applied through linkedIn and got the response from the hiring manager. Then recived a call from HR for the basic screening. Then they scheduled the Telephonic interview with one of the technical team member, then followed by two F2F technical interviews and a manager round. The whole process took a week long.
Preguntas de entrevista [2]
Pregunta 1
Requirement gathering and defining the software requirements.